Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 20, 2019, 11:01 AM
  • B 0698A_B 0698 _12202019_030933.mp4

Date
12/20/2019
W/O
803092
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00110
PipeID
P09369
Time
3:01 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7257
Sewer Name
B JOINT OUTFALL B - UNIT 8G
City
DUARTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_803092_TV22155_DEC2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
B 0698A
Downstream MH
B 0698
Dir. of Survey
Downstream
Length Surveyed
170 ft.
Total Length
170 ft.
Structural Index
3
Structural Quick
3F2F
Structural Rating
165
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
165
Pipe schematic from manhole B 0698A to B 0698
MH: B 0698AMH: B 0698downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. AMH - Upstream Manhole, Survey Begins - B 0698A0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Start2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 40% MAG THROUGHOUT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start19.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6" - OPEN28.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN110.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"113.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN154.1 ft. MWM - Water Mark, 20 %of cross sectional area164.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 6"168 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 40% MAG THROUGHOUT168 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish168.8 ft. SAV - Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish170 ft. AMH - Downstream Manhole, Survey Ends - B 0698170 ft. MGO - General Observation - COCKROACHES IN MANHOLE170 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE

Observation photos (3)

  • General Observation - COCKROACHES IN MANHOLE

    0 ft. - General Observation - COCKROACHES IN MANHOLE

  • Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    170 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (19)

DistanceCodeObservation
2SAV
168SZ40% MAG THROUGHOUT
0MWM
0MGOCOCKROACHES IN MANHOLE
170AMHB 0698
154.1MWM
0AMHB 0698A
2SZ40% MAG THROUGHOUT
168SSS
113.4TFOPEN
170MGOCOCKROACHES IN MANHOLE
28.6TFOPEN
2SSS
164.3TFA
19.5TFOPEN
170MGOCONN @ MH 3 O'CLOCK/ACTIVE
0MWL
110.3TFC
168.8SAV

Properties (6)

additional_info
SC378891
custom_field_two
3
customer
LACSD
datetime
2019-12-20T03:01:00-08:00
documentation
PRO PIPE
is_lateral_inspection
false