Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 3, 2020, 08:41 AM
  • 20 0228_20 0227_01032020_005716.mp4

Date
01/03/2020
W/O
803091
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00735
PipeID
P19195
Time
12:41 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7264
Sewer Name
20 AVENUE "Q" TRUNK
City
PALMDALE
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 20
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_803091_TV20051_DEC2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
20 0228
Downstream MH
20 0227
Dir. of Survey
Downstream
Length Surveyed
319.4 ft.
Total Length
319.4 ft.
Structural Index
3
Structural Quick
3L2K
Structural Rating
316
O&M Index
2
O&M Quick
2L00
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
442
Pipe schematic from manhole 20 0228 to 20 0227
MH: 20 0228MH: 20 0227downstream0 ft. MGO - General Observation - CAPPED CONNECTION AT MH - 9 O'CLOCK0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 20 02280 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start5.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start30.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"34.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"70.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"73.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"125 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"156.8 ft. FS - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES174 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"177.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"222.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"225.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"270.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"274 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"317.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish317.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish317.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish319 ft. MGO - General Observation - VERMIN (RAT) @ D/S MH - 9 O'CLOCK319.4 ft. AMH - Downstream Manhole, Survey Ends - 20 0227319.4 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES

    156.8 ft. - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES

Observations (27)

DistanceCodeObservation
222.9TFC
319MGOVERMIN (RAT) @ D/S MH - 9 O'CLOCK
70.3TFC
2SAP
0MGOCAPPED CONNECTION AT MH - 9 O'CLOCK
0MWM
125TFC
30.9TFC
274TFC
174TFC
34.4TFC
317.7SAP
122.1TFC
270.7TFC
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2DAGS
319.4AMH20 0227
156.8FS
319.4MGOACTIVE CONNECTION AT MH 3 O'CLOCK
177.3TFC
317.7SSS
317.7DAGS
73.5TFC
5.7SSS
0AMH20 0228
0MWL
225.9TFC

Properties (6)

additional_info
SC378900
custom_field_two
2
customer
LACSD
datetime
2020-01-03T00:41:25-08:00
documentation
PRO PIPE
is_lateral_inspection
false