Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 19, 2019, 06:41 AM
  • F 0270_F 0269 _12182019_225958.mp4

Date
12/18/2019
W/O
802990
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00040
PipeID
P10223
Time
10:41 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7219
Sewer Name
F JOINT OUTFALL F - UNIT 4 RELIEF
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
WO_802990_TV02236_DEC2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
F 0270
Downstream MH
F 0269
Dir. of Survey
Downstream
Length Surveyed
618.6 ft.
Total Length
618.6 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole F 0270 to F 0269
MH: F 0270MH: F 0269downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 02700 ft. MWM - Water Mark, 30 %of cross sectional area2.1 ft. MGO - General Observation - MAG COAT4.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start124.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start124.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish124.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start618.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish618.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish618.6 ft. AMH - Downstream Manhole, Survey Ends - F 0269

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    124.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    124.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0MWL
618.6SSS
0AMHF 0270
2.1MGOMAG COAT
124.1SSS
618.6SAP
618.6AMHF 0269
124.1SAV
124.1SAP
4.4SAV
0MWM

Properties (7)

additional_info
SC398510
custom_field_two
3
customer
LACSD
datetime
2019-12-18T22:41:21-08:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
31219