Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 19, 2019, 07:41 AM
  • F 0267_F 0266 _12182019_235707.mp4

Date
12/18/2019
W/O
802990
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00040
PipeID
P10220
Time
11:41 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7219
Sewer Name
F JOINT OUTFALL F - UNIT 4 RELIEF
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
WO_802990_TV02236_DEC2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
F 0267
Downstream MH
F 0266
Dir. of Survey
Downstream
Length Surveyed
597.1 ft.
Total Length
597.1 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole F 0267 to F 0266
MH: F 0267MH: F 0266downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 02673.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start338.8 ft. SRP - Surface Reinforcement Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO597.1 ft. AMH - Downstream Manhole, Survey Ends - F 0266597.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish597.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO

    338.8 ft. - Surface Reinforcement Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO

Observations (9)

DistanceCodeObservation
0MWM
338.8SRP
597.1AMHF 0266
597.1SSS
3.7SSS
0MWL
597.1SAP
3.7SAP
0AMHF 0267

Properties (7)

additional_info
SC398511
custom_field_two
2
customer
LACSD
datetime
2019-12-18T23:41:01-08:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
31219