Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 19, 2019, 10:25 AM
  • F 0262_F 0261 _12192019_023451.mp4

Date
12/19/2019
W/O
802990
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00040
PipeID
P10215
Time
2:25 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7219
Sewer Name
F JOINT OUTFALL F - UNIT 4 RELIEF
City
NORWALK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
WO_802990_TV02236_DEC2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
39 in.
Width
39 in.
Upstream MH
F 0262
Downstream MH
F 0261
Dir. of Survey
Downstream
Length Surveyed
163.5 ft.
Total Length
163.5 ft.
Structural Index
3
Structural Quick
5C3E
Structural Rating
255
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
255
Pipe schematic from manhole F 0262 to F 0261
MH: F 0262MH: F 0261downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 02622 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - HEAVY STEAM2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start70.6 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start163 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish163.5 ft. SRV - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish163.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish163.5 ft. AMH - Downstream Manhole, Survey Ends - F 0261

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

    70.6 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2SSS
163SSS
2.1MGOHEAVY STEAM
163.5SRV
163.5SAP
0MWM
163.5AMHF 0261
0MWL
2.1SAP
70.6SRV
0AMHF 0262

Properties (7)

additional_info
SC398511
custom_field_two
2
customer
LACSD
datetime
2019-12-19T02:25:17-08:00
documentation
PROPIPE
is_lateral_inspection
false
year_laid
31219