Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 3, 2020, 07:20 AM
  • 14 0508_14 0507_01022020_233053.mp4

Date
01/02/2020
W/O
802978
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00579
PipeID
P18599
Time
11:20 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7263
Sewer Name
14 TRUNK "C"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_802978_TV14070_DEC2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0508
Downstream MH
14 0507
Dir. of Survey
Downstream
Length Surveyed
197.5 ft.
Total Length
197.5 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
195
O&M Index
2
O&M Quick
412G
O&M Rating
82
Overall Index
2
Overall Quick
Overall Rating
277
Pipe schematic from manhole 14 0508 to 14 0507
MH: 14 0508MH: 14 0507downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 05080 ft. MWM - Water Mark, 70 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start17.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"41.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"70.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"95 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"119.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"144.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"168.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"189.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"196.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish196.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish196.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish197.5 ft. AMH - Downstream Manhole, Survey Ends - 14 0507197.5 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0MGOCONNECTION AT MH 3 O'CLOCK
0MWL
70.2TFC
197.5AMH14 0507
2SAP
168.8TFC
0AMH14 0508
95TFC
144.4TFC
119.7TFC
0MWM
2DAGS
197.5MGOCONNECTION AT MH 9 O'CLOCK
196.5SSS
196.5DAGS
196.5SAP
2SSS
41.6TFC
17.1TFC
189.5TFC

Properties (6)

additional_info
SC378899
custom_field_two
2
customer
LACSD
datetime
2020-01-02T23:20:01-08:00
documentation
PRO PIPE
is_lateral_inspection
false