Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 3, 2020, 07:31 AM
  • 14 0507_14 0506A_01022020_233844.mp4

Date
01/02/2020
W/O
802978
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00579
PipeID
P18598
Time
11:31 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7263
Sewer Name
14 TRUNK "C"
City
LANCASTER
Loc. details
Main Highway - Suburban/Rural
Location Code
B
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_802978_TV14070_DEC2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0507
Downstream MH
14 0506A
Dir. of Survey
Downstream
Length Surveyed
137.6 ft.
Total Length
137.6 ft.
Structural Index
3
Structural Quick
3D2D
Structural Rating
135
O&M Index
2
O&M Quick
412D
O&M Rating
58
Overall Index
2
Overall Quick
Overall Rating
193
Pipe schematic from manhole 14 0507 to 14 0506A
MH: 14 0507MH: 14 0506Adownstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 05070 ft. MWM - Water Mark, 65 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start20.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"48.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"73.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"122.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"134.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish134.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Finish134.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish137.6 ft. AMH - Downstream Manhole, Survey Ends - 14 0506A137.6 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 02 to 10 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
122.5TFC
48.9TFC
0MWL
73.4TFC
2DAGS
20.1TFC
134.8SAP
134.8DAGS
137.6AMH14 0506A
137.6MGOCONNECTION AT MH 9 O'CLOCK
2SSS
0AMH14 0507
2SAP
0MWM
134.8SSS

Properties (6)

additional_info
SC378899
custom_field_two
2
customer
LACSD
datetime
2020-01-02T23:31:02-08:00
documentation
PRO PIPE
is_lateral_inspection
false