18 0467_18 0466_1212020_040834.mp4
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
12.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
13.4 ft. - Surface Reinforcement Corroded, from 01 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
20.6 ft. - Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: YES, - CIRCUM REBAR
23 ft. - Surface Reinforcement Corroded, from 11 to 12 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
26.2 ft. - Surface Reinforcement Corroded, from 12 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
31.4 ft. - Surface Reinforcement Corroded, from 12 to 03 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR
34.3 ft. - Surface Reinforcement Corroded, from 08 to 11 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
42.2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - LONG CIRCUM REBAR
47.6 ft. - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
54.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR SPORATIC
71.7 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR
103.3 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR
126.4 ft. - Surface Reinforcement Visible, from 12 to 03 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR
177.2 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO, Start - CIRCUM REBAR
185.8 ft. - Surface Reinforcement Corroded, from 12 to 03 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
230.1 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES - LONG CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 47.6 | SRV | CIRCUM REBAR |
| 234 | MWM | — |
| 145 | TF | Open |
| 44.6 | SRV | CIRCUM REBAR |
| 122.4 | TF | Open |
| 95 | TF | Open |
| 71.7 | SRC | LONG CIRCUM REBAR |
| 69.7 | TF | Active |
| 230.1 | SRC | LONG CIRCUM REBAR |
| 234.1 | SRV | LONG CIRCUM REBAR SPORATIC |
| 43.4 | TF | Open |
| 31.4 | SRC | LONG CIRCUM REBAR |
| 177.2 | SRC | CIRCUM REBAR |
| 234 | MWL | — |
| 20.6 | SRC | CIRCUM REBAR |
| 2 | SAP | SEVERE AGG |
| 12.4 | SAM | SEVERE AGG |
| 0 | MWL | — |
| 126.4 | SRV | LONG CIRCUM REBAR |
| 11 | TF | Open |
| 181.3 | SRC | CIRCUM REBAR |
| 103.3 | SRV | LONG CIRCUM REBAR |
| 34.3 | SRC | CIRCUM REBAR |
| 76.8 | SRC | LONG CIRCUM REBAR |
| 13.4 | SRC | CIRCUM REBAR |
| 54.1 | SRV | LONG CIRCUM REBAR SPORATIC |
| 21.3 | SRC | CIRCUM REBAR |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 42.2 | SRV | LONG CIRCUM REBAR |
| 23 | SRC | CIRCUM REBAR |
| 185.8 | SRC | CIRCUM REBAR |
| 277.2 | SAM | SEVERE AGG |
| 39 | SRC | — |
| 277.2 | SAP | SEVERE AGG |
| 277.2 | SSS | BLISTERING PEELING CONCRETE |
| 277.8 | AMH | 4:55AM |
| 0 | AMH | 4:05AM |
| 26.2 | SRC | LONG CIRCUM REBAR |
| 0 | MWM | — |