Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 21, 2020, 11:19 AM
  • 18 0468_18 0467_1212020_032545.mp4

Date
01/21/2020
W/O
0808176
Weather
Light Rain
Operator/Surveyor
MARTIN
Sewer ID
Z00691
PipeID
P14322
Time
3:19 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1333
Sewer Name
18 NORTH PLANT OUTFALL TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
14
Purpose
Capital Improvement Program Assesment
Project
20200117_NORTH_PLANT_OUTFALL_TRUNK
Material
NRCP
Shape
Circular
Height
21 in.
Upstream MH
18 0468
Downstream MH
18 0467
Dir. of Survey
Downstream
Length Surveyed
292.7 ft.
Total Length
292.7 ft.
Structural Index
3
Structural Quick
4123
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 18 0468 to 18 0467
MH: 18 0468MH: 18 0467downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:25AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG13.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED25.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open37.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open60.8 ft. MGO - General Observation - AREAS OF OLD MAG COAT ON PIPE67.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open86.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open122.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open142 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED155.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open183.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open205.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open234.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 6" - Open248.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open280.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open292.3 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED292.3 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG292.7 ft. AMH - Downstream Manhole, Survey Ends - 3:50AM

Observation photos (5)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

    13.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

  • General Observation - AREAS OF OLD MAG COAT ON PIPE

    60.8 ft. - General Observation - AREAS OF OLD MAG COAT ON PIPE

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED

    142 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING CONCRETE SEVERE AGG ATTACHED

Observations (22)

DistanceCodeObservation
122.2TFOpen
205.4TFOpen
37.9TFOpen
292.3SSSPEELING CONCRETE SEVERE AGG ATTACHED
0MWM
155.4TFOpen
234.5TFOpen
0AMH3:25AM
86.6TFOpen
142SSSPEELING CONCRETE SEVERE AGG ATTACHED
67.2TFOpen
0MWL
280.6TFOpen
248.1TFOpen
2SSSPEELING CONCRETE SEVERE AGG ATTACHED
25.3TFOpen
292.3SAMSEVERE AGG
183.5TFOpen
60.8MGOAREAS OF OLD MAG COAT ON PIPE
2SAMSEVERE AGG
13.5SSSPEELING CONCRETE SEVERE AGG ATTACHED
292.7AMH3:50AM

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
1
customer
LACSD
datetime
2020-01-21T03:19:41-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false