18 0479_18 0478_1172020_024644.mp4
2 ft. - General Observation - MAG COAT 80% START
2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
15.9 ft. - General Observation - MAG COAT 90% START
29.8 ft. - Surface Aggregate Projecting, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
69 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
249.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AQGG
593.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 676 | MGO | 90% MAG COAT FINISH |
| 29.8 | SAP | SEVERE AGG |
| 345.3 | TF | Active |
| 249.9 | SAP | SEVERE AQGG |
| 0 | MWL | — |
| 2 | MGO | MAG COAT 80% START |
| 546.2 | TFA | Active |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 278.2 | DSZ | SLUDGE |
| 0 | AMH | 2:50AM |
| 175.1 | MWL | — |
| 593.3 | SAP | SEVERE AGG |
| 381.1 | DSZ | SLUDGE |
| 2 | SAP | SEVERE AGG UNDER MAG COAT |
| 676.7 | AMH | 3:35AM |
| 0 | MWM | — |
| 676 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 69 | SAP | SEVERE AGG |
| 162.8 | DSZ | SLUDGE |
| 278.2 | MWL | — |
| 153.4 | TFA | Active |
| 676 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 337 | TF | Open |
| 676 | SAP | SEVERE AGG |
| 15.9 | MGO | MAG COAT 90% START |
| 153.4 | DAGS | — |