Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 19, 2019, 10:59 AM
  • 22 0786_22 0785 _12192019_030936.mp4

Date
12/19/2019
W/O
803098
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00824
PipeID
P17150
Time
2:59 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7255
Sewer Name
22 RAMONA AVENUE TRUNK
City
LA VERNE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Routine Assessment
Project
RFIR_WO_803098_TV22089_DEC2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0786
Downstream MH
22 0785
Dir. of Survey
Downstream
Length Surveyed
350.4 ft.
Total Length
350.4 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
345
O&M Index
2
O&M Quick
2M12
O&M Rating
140
Overall Index
2
Overall Quick
Overall Rating
485
Pipe schematic from manhole 22 0786 to 22 0785
MH: 22 0786MH: 22 0785downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. VC - Vermin Cockroach, within 8 inches of joint: YES - @ MH0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 07862 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 35% LIGHT MAG COATING THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start81.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN125.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN213.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN270.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4", 6" - OPEN346 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish347 ft. VC - Vermin Cockroach, within 8 inches of joint: YES - @ MH348.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish348.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish350.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0785

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - 35% LIGHT MAG COATING THROUGHOUT

    2 ft. - General Observation - 35% LIGHT MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
346SSS
350.4AMH22 0785
213.6TFOPEN
0MWL
0VC@ MH
81.2TFOPEN
270.2TFOPEN
0MWM
2SAP
0AMH22 0786
2MGO35% LIGHT MAG COATING THROUGHOUT
347VC@ MH
125.2TFOPEN
348.5DAGS
348.5SAP
2DAGS
2SSS

Properties (6)

additional_info
SC378889
custom_field_two
3
customer
LACSD
datetime
2019-12-19T02:59:14-08:00
documentation
PRO PIPE
is_lateral_inspection
false