Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 9, 2020, 08:26 AM
  • 02 2096_02 2095_192020_004005.mp4

Date
01/09/2020
W/O
0808077
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00283
PipeID
P04197
Time
12:26 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1323
Sewer Name
02 MONTEBELLO INTERCEPTOR TRUNK, SECTS 1&2
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
20200107MDM_MONTEBELLO_INTERCEPTOR_TRUNK_SECTS_1_2
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
02 2096
Downstream MH
02 2095
Dir. of Survey
Downstream
Length Surveyed
546.8 ft.
Total Length
546.8 ft.
Structural Index
3
Structural Quick
3523
Structural Rating
21
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
25
Pipe schematic from manhole 02 2096 to 02 2095
MH: 02 2096MH: 02 2095downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:40AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE5.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG5.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG10.3 ft. SAP - Surface Aggregate Projecting, from 01 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG27.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG50.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC64.4 ft. SSS - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - PEELING CONCRETE MULTIBLE LAYER73.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE IN SHEETS513.2 ft. MWL - Water Level, 30 %of cross sectional area513.2 ft. MWM - Water Mark, 50 %of cross sectional area532.8 ft. MWM - Water Mark, 30 %of cross sectional area532.8 ft. MWL - Water Level, 10 %of cross sectional area546.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC546.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE546.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC546.8 ft. AMH - Downstream Manhole, Survey Ends - 1:15AM

Observation photos (8)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    5.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 01 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    10.3 ft. - Surface Aggregate Projecting, from 01 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    27.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    50.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - PEELING CONCRETE MULTIBLE LAYER

    64.4 ft. - Surface Spalling, from 08 to 12 o'clock, within 8 inches of joint: YES - PEELING CONCRETE MULTIBLE LAYER

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE IN SHEETS

    73.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE IN SHEETS

Observations (20)

DistanceCodeObservation
73.7SSSPEELING CONCRETE IN SHEETS
513.2MWL
64.4SSSPEELING CONCRETE MULTIBLE LAYER
2SAPSEVERE AGG
532.8MWM
546.4SAVSEVERE AGG SPORATIC
0MWM
532.8MWL
0AMH12:40AM
546.8AMH1:15AM
10.3SAPSEVERE AGG
5.3SAPSEVERE AGG
513.2MWM
546.4SSSBLISTERING PEELING CONCRETE
546.4SAPSEVERE AGG SPORATIC
5.5SAVSEVERE AGG
0MWL
50.3SAPSEVERE AGG SPORATIC
2SSSBLISTERING PEELING CONCRETE
27.6SAPSEVERE AGG

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2020-01-09T00:26:44-08:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO
is_lateral_inspection
false