Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 8, 2020, 10:55 AM
  • 02 2098_02 2097_182020_034146.mp4

Date
01/08/2020
W/O
0808077
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00283
PipeID
P04199
Time
2:55 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1322
Sewer Name
02 MONTEBELLO INTERCEPTOR TRUNK, SECTS 1&2
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
20200107MDM_MONTEBELLO_INTERCEPTOR_TRUNK_SECTS_1_2
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
02 2098
Downstream MH
02 2097
Dir. of Survey
Downstream
Length Surveyed
565.7 ft.
Total Length
565.7 ft.
Structural Index
3
Structural Quick
3622
Structural Rating
22
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
22
Pipe schematic from manhole 02 2098 to 02 2097
MH: 02 2098MH: 02 2097downstream0 ft. AMH - Upstream Manhole, Survey Begins - 3:45AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLITERING PEELING CONCRETE35.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC56.9 ft. SSS - Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING SHEETS OF COCRETE130.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG145.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVBERE AGG SPORATIC151.2 ft. SAP - Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES, - SEVERE AGG359.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG565.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE565.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG565.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG565.7 ft. AMH - Downstream Manhole, Survey Ends - 4:25AM

Observation photos (7)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLITERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLITERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

    35.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

  • Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING SHEETS OF COCRETE

    56.9 ft. - Surface Spalling, from 12 to 04 o'clock, within 8 inches of joint: NO - PEELING SHEETS OF COCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVBERE AGG SPORATIC

    145.7 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVBERE AGG SPORATIC

  • Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES,  - SEVERE AGG

    151.2 ft. - Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES, - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    359.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (15)

DistanceCodeObservation
130.5SAPSEVERE AGG
565.7AMH4:25AM
565.3SSSBLISTERING PEELING CONCRETE
565.3SAPSEVERE AGG
151.2SAPSEVERE AGG
565.3SAVSEVERE AGG
2SAVSEVERE AGG SPORATIC
359.8SAPSEVERE AGG
35.9SAVSEVERE AGG SPORATIC
145.7SAPSEVBERE AGG SPORATIC
0AMH3:45AM
0MWL
56.9SSSPEELING SHEETS OF COCRETE
0MWM
2SSSBLITERING PEELING CONCRETE

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2020-01-08T02:55:01-08:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO
is_lateral_inspection
false