- Date
- 01/07/2020
- W/O
- 0808077
- Weather
- Dry
- Operator/Surveyor
- MARTIN
- Sewer ID
- Z00283
- PipeID
- P04204
- Time
- 3:48 AM
- Certificate
- 1014-06022543
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H1321
- Sewer Name
- 02 MONTEBELLO INTERCEPTOR TRUNK, SECTS 1&2
- City
- MONTEBELLO
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 18
- Purpose
- Routine Assessment
- Project
- 20200107MDM_MONTEBELLO_INTERCEPTOR_TRUNK_SECTS_1_2
- Material
- Reinforced Concrete Pipe
- Shape
- Circular
- Height
- 27 in.
- Upstream MH
- 02 2102
- Downstream MH
- 02 2101
- Dir. of Survey
- Downstream
- Length Surveyed
- 387.8 ft.
- Total Length
- 387.8 ft.
- Structural Index
- 3
- Structural Quick
- 3221
- Structural Rating
- 8
- O&M Index
- 2
- O&M Quick
- 2100
- O&M Rating
- 2
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 10
Pipe schematic from manhole 02 2102 to 02 2101 Observation photos (3)

2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

239.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG