Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 7, 2020, 11:48 AM
  • 02 2102_02 2101_172020_035603.mp4

Date
01/07/2020
W/O
0808077
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00283
PipeID
P04204
Time
3:48 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1321
Sewer Name
02 MONTEBELLO INTERCEPTOR TRUNK, SECTS 1&2
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
20200107MDM_MONTEBELLO_INTERCEPTOR_TRUNK_SECTS_1_2
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
02 2102
Downstream MH
02 2101
Dir. of Survey
Downstream
Length Surveyed
387.8 ft.
Total Length
387.8 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 02 2102 to 02 2101
MH: 02 2102MH: 02 2101downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:55AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC21.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK239.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG261 ft. MWM - Water Mark, 40 %of cross sectional area387.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC387.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE387.8 ft. AMH - Downstream Manhole, Survey Ends - 4:20AM

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    239.6 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (11)

DistanceCodeObservation
387.5SAVSEVERE AGG SPORATIC
387.8AMH4:20AM
21.4DSZROCK
2SSSBLISTERING PEELING CONCRETE
2SAVSEVERE AGG SPORATIC
0MWM
0MWL
0AMH3:55AM
261MWM
387.5SSSBLISTERING PEELING CONCRETE
239.6SAVSEVERE AGG

Properties (6)

custom_field_three
SEVERE AGG SPORATIC
custom_field_two
3
customer
LACSD
datetime
2020-01-07T03:48:28-08:00
documentation
MARTIN,OLIVER 111,IGNACIO
is_lateral_inspection