Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 13, 2020, 09:45 AM
  • B 0385_B 0384_1132020_015345.mp4

Date
01/13/2020
W/O
0808393
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00091
PipeID
P08897
Time
1:45 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1326
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
SAN MARINO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Routine Assessment
Project
20200110MDM_JOINT_OUTFALL_B_UNIT_5A
Material
NRCP
Shape
Circular
Height
21 in.
Upstream MH
B 0385
Downstream MH
B 0384
Dir. of Survey
Downstream
Length Surveyed
267.9 ft.
Total Length
267.9 ft.
Structural Index
3
Structural Quick
3421
Structural Rating
14
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
18
Pipe schematic from manhole B 0385 to B 0384
MH: B 0385MH: B 0384downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:45AM0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC88.2 ft. SAV - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC200.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG SPORATIC263.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG267.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish - SEVERE AGG SPORATIC267.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING FLAKING CONCRETE267.6 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC267.9 ft. AMH - Downstream Manhole, Survey Ends - 2:05AM

Observation photos (5)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING FLAKING CONCRETE

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    88.2 ft. - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG SPORATIC

    200.2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    263.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (12)

DistanceCodeObservation
0AMH1:45AM
200.2SAPSEVERE AGG SPORATIC
88.2SAVSEVERE AGG SPORATIC
2SSSBLISTERING FLAKING CONCRETE
267.6SAPSEVERE AGG SPORATIC
267.9AMH2:05AM
0MWM
263.4SAPSEVERE AGG
267.6SSSBLISTERING FLAKING CONCRETE
2SAVSEVERE AGG SPORATIC
0MWL
267.6SAVSEVERE AGG SPORATIC

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2020-01-13T01:45:33-08:00
documentation
MARTIN,OLIVER 111,IGNACIO
is_lateral_inspection
false