Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 14, 2020, 09:23 AM
  • B 0380_B 0379_1142020_012716.mp4

Date
01/14/2020
W/O
0808393
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00091
PipeID
P08892
Time
1:23 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1327
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
SAN MARINO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Routine Assessment
Project
20200110MDM_JOINT_OUTFALL_B_UNIT_5A
Material
NRCP
Shape
Circular
Height
21 in.
Upstream MH
B 0380
Downstream MH
B 0379
Dir. of Survey
Downstream
Length Surveyed
327.8 ft.
Total Length
327.8 ft.
Structural Index
3
Structural Quick
3321
Structural Rating
11
O&M Index
4
O&M Quick
4200
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
19
Pipe schematic from manhole B 0380 to B 0379
MH: B 0380MH: B 0379downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:25AM0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING,FLAKING ,PEELING CONCRETE2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC35.8 ft. SAP - Surface Aggregate Projecting, from 12 to 03 o'clock, within 8 inches of joint: YES - SEVERTE AGG49.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG315.3 ft. MWM - Water Mark, 60 %of cross sectional area327.5 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG327.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG327.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING FLAKING PEELING CONCRETE327.8 ft. AMH - Downstream Manhole, Survey Ends - 1:50AM

Observation photos (5)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING,FLAKING ,PEELING CONCRETE

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING,FLAKING ,PEELING CONCRETE

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Aggregate Projecting, from 12 to 03 o'clock, within 8 inches of joint: YES - SEVERTE AGG

    35.8 ft. - Surface Aggregate Projecting, from 12 to 03 o'clock, within 8 inches of joint: YES - SEVERTE AGG

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    49.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Water Mark, 60 %of cross sectional area

    315.3 ft. - Water Mark, 60 %of cross sectional area

Observations (12)

DistanceCodeObservation
327.5SAVSEVERE AGG
327.5SAPSEVERE AGG
0AMH1:25AM
327.5SSSBLISTERING FLAKING PEELING CONCRETE
315.3MWM
2SSSBLISTERING,FLAKING ,PEELING CONCRETE
2SAVSEVERE AGG SPORATIC
35.8SAPSEVERTE AGG
49.3SAPSEVERE AGG
0MWM
0MWL
327.8AMH1:50AM

Properties (6)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
3
customer
LACSD
datetime
2020-01-14T01:23:08-08:00
documentation
MARTIN,OLIVER 111,IGNACIO
is_lateral_inspection
false