H 1491_H 1490 _12162019_030845.mp4
2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
349.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
599.9 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
647.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
653.4 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 632.4 | SRV | — |
| 2 | SAP | — |
| 613.4 | MWLS | — |
| 0 | MWL | — |
| 632.4 | SAP | — |
| 632.4 | SSS | — |
| 349.4 | SSS | — |
| 619.5 | DSZ | DEBRIS |
| 819 | AMH | H 1490 |
| 599.9 | SRV | — |
| 653.4 | SRV | — |
| 816.4 | SRV | — |
| 647.9 | SAP | — |
| 816.4 | DAGS | — |
| 0 | AMH | H 1491 |
| 537.4 | TF | — |
| 669 | MWLS | — |
| 816.4 | SAP | — |
| 719.8 | DSZ | — |
| 2 | DAGS | — |
| 0 | MWM | — |