Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 17, 2019, 07:40 AM
  • 22 0360_22 0359 _12172019_000348.mp4

Date
12/16/2019
W/O
798663
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00831
PipeID
P16692
Time
11:40 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7188
Sewer Name
22 WALNUT CREEK TRUNK, SECTION 3
City
WEST COVINA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
WO_798663_TV22066_NOV2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
22 0360
Downstream MH
22 0359
Dir. of Survey
Downstream
Length Surveyed
404.9 ft.
Total Length
404.9 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
400
O&M Index
2
O&M Quick
2O00
O&M Rating
164
Overall Index
2
Overall Quick
Overall Rating
564
Pipe schematic from manhole 22 0360 to 22 0359
MH: 22 0360MH: 22 0359downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 03602 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.2 ft. MGO - General Observation - 75% MAG COAT THROUGHOUT2.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start76.1 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES184.1 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES400 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish402.4 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish402.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish404.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0359

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.7 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
0MWL
76.1DSC
402.4SAV
400DAGS
2.7SAV
0MWM
2.2MGO75% MAG COAT THROUGHOUT
404.9AMH22 0359
2SSS
2DAGS
402.4SSS
184.1DSC
0AMH22 0360

Properties (6)

additional_info
SC398428
custom_field_two
3
customer
LACSD
datetime
2019-12-16T23:40:33-08:00
documentation
PROPIPE
is_lateral_inspection
false