16 0521_16 0520 _12312019_015519.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
7 ft. - Roots Medium Joint, from 08 to 02 o'clock, 30 %, within 8 inches of joint: YESR
18.2 ft. - Roots Medium Joint, from 08 to 04 o'clock, 20 %, within 8 inches of joint: YESR, Start
22.6 ft. - Crack Spiral, from 10 to 12 o'clock, within 8 inches of joint: YES
24.2 ft. - Roots Medium Connection, from 07 to 11 o'clock, 15 %, within 8 inches of joint: YES
59.6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
72.2 ft. - Tap Break-In Intruding, at 02 o'clock, -, #v, within 8 inches of joint: YES, 6", 2" - ACTIVE
99.5 ft. - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 4"
| Distance | Code | Observation |
|---|---|---|
| 0 | MGO | POSSIBLE CONN. & ACTV. @ U/S MH - 9 O'CLOCK |
| 22.6 | CS | — |
| 7 | RMJ | — |
| 0 | AMH | 16 0521 |
| 72.2 | TBI | ACTIVE |
| 2 | DAGS | — |
| 18.2 | RMJ | — |
| 181 | DAGS | — |
| 183.7 | AMH | 16 0520 |
| 0 | MWL | — |
| 169.8 | TBA | — |
| 181 | MGO | CAPPED CONNECTION @ D/S MH - 3 O'CLOCK |
| 181 | CM | — |
| 24.2 | TBA | FLOW STATUS UNKNOWN @ THIS TIME |
| 59.6 | CM | — |
| 99.5 | TBA | — |
| 0 | MWM | — |
| 56 | RMJ | — |
| 24.2 | RMC | — |
| 29.8 | TBA | — |