Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 18, 2019, 09:08 AM
  • 02 0724_02 0723_12182019_012123.mp4

Date
12/18/2019
W/O
803134
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00294
PipeID
P03278
Time
1:08 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7216
Sewer Name
02 OLD RIVER SCHOOL ROAD TRUNK, SECTS 1&2
City
DOWNEY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
29
Purpose
Routine Assessment
Project
RFIR_WO_803134_TV02351_DEC2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
02 0724
Downstream MH
02 0723
Dir. of Survey
Downstream
Length Surveyed
251.2 ft.
Total Length
251.2 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 02 0724 to 02 0723
MH: 02 0724MH: 02 0723downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 07240 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"13.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"27.1 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES31.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start95.2 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start102.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"104.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"220.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"223.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"230 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish230 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish251.2 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK251.2 ft. AMH - Downstream Manhole, Survey Ends - 02 0723251.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    31.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    95.2 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
251.2MGOCONNECTION AT MH 9 O'CLOCK
223.6TFC
251.2AMH02 0723
104.9TFC
95.2FL
0AMH02 0724
2.1SSS
31.5CM
102.5TF
251.2CM
13.2TFC
27.1CL
0MWL
0MWM
230SSS
230FL
11.3TFC
220.2TFC

Properties (5)

custom_field_two
2
customer
LACSD
datetime
2019-12-18T01:08:57-08:00
documentation
PROPIPE
is_lateral_inspection
false