A 0465_A 0464_1222016_094843.mp4

0 ft. - Upstream Manhole, Survey Begins - 9:21 AM, MIDDLE AIRLINE INSPECTION ONLY
9.5 ft. - Broken, from 07 to 05 o'clock, within 8 inches of joint: YES
15.2 ft. - Broken, from 11 to 05 o'clock, within 8 inches of joint: YES
20.3 ft. - Broken, from 10 to 01 o'clock, within 8 inches of joint: YES
31.5 ft. - Broken, from 07 to 09 o'clock, within 8 inches of joint: YES
46.5 ft. - Broken, from 08 to 01 o'clock, within 8 inches of joint: YES
62.5 ft. - Broken, from 09 to 05 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 122.4 | AMH | 10:21 AM |
| 62.5 | B | — |
| 122.3 | CM | — |
| 20.3 | B | — |
| 0 | MWL | DRY LINE |
| 26.1 | B | — |
| 46.5 | B | — |
| 51.9 | B | — |
| 0 | AMH | 9:21 AM, MIDDLE AIRLINE INSPECTION ONLY |
| 36.5 | CM | — |
| 122.3 | MGO | SLIGHT DEBRIS THROUGHOUT THE REACH |
| 15.2 | B | — |
| 31.5 | B | — |
| 122.3 | MGO | BROKEN PIPE AT THE JOINTS THROUGHOUT THE REACH |
| 9.5 | B | — |