Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 16, 2019, 11:48 AM
  • 02 1094_02 1093_12162019_Manual.mp4

Date
12/16/2019
W/O
0807676
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00282
PipeID
P03668
Time
3:48 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0300
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
20191216MDM_MONTEBELLO_DIVERSION_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 1094
Downstream MH
02 1093
Dir. of Survey
Downstream
Length Surveyed
196.9 ft.
Total Length
197 ft.
Structural Index
3
Structural Quick
513G
Structural Rating
206
O&M Index
2
O&M Quick
2B00
O&M Rating
26
Overall Index
2
Overall Quick
Overall Rating
232
Pipe schematic from manhole 02 1094 to 02 1093
MH: 02 1094MH: 02 1093downstream0 ft. MWL - Water Level, 0 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:00AM1 ft. MGO - General Observation - COMPUTOR VEDIO CLIP STOPPED WORKING2 ft. MGO - General Observation - MAG COAT 25% START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG VERY SPORATIC2 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE67.4 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - SLUDGE175.2 ft. MGO - General Observation - RUST STAINS ON CONCRETE 12:00189 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG189 ft. SRC - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES - CIRCUM REBAR 1196.7 ft. MGO - General Observation - OLD MAG COAT 25% FINISH196.7 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG196.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE196.7 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG VERY SPORATIC197 ft. AMH - Downstream Manhole, Survey Ends - 4:25AM

Observations (17)

DistanceCodeObservation
196.7MGOOLD MAG COAT 25% FINISH
0MWL
175.2MGORUST STAINS ON CONCRETE 12:00
196.7SAPSEVERE AGG
1MGOCOMPUTOR VEDIO CLIP STOPPED WORKING
196.7SSSBLISTERING PEELING CONCRETE
0MWM
0AMH4:00AM
196.7SAVSEVERE AGG VERY SPORATIC
67.4DSZSLUDGE
197AMH4:25AM
2MGOMAG COAT 25% START
2SSSBLISTERING PEELING CONCRETE
189SAPSEVERE AGG
2SAVSEVERE AGG VERY SPORATIC
2DSZSLUDGE
189SRCCIRCUM REBAR 1

Properties (6)

custom_field_three
I CIRCUM REBAR CORRODED-SEVERE AGG VISIBLE SPORATI
custom_field_two
3
customer
LACSD
datetime
2019-12-16T03:48:21-08:00
documentation
MARTIN,REVELES,IGNACIO
is_lateral_inspection
false