Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 16, 2019, 10:12 AM
  • 1_1_2_16122019_021946.mp4

Date
12/16/2019
W/O
0807676
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00282
PipeID
P03670
Time
2:12 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0300
Sewer Name
02 MONTEBELLO DIVERSION TRUNK
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
18
Purpose
Routine Assessment
Project
20191216MDM_MONTEBELLO_DIVERSION_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Upstream MH
02 1016
Downstream MH
02 1993
Dir. of Survey
Downstream
Length Surveyed
15.8 ft.
Total Length
15.8 ft.
Structural Index
4
Structural Quick
5343
Structural Rating
33
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
33
Pipe schematic from manhole 02 1016 to 02 1993
MH: 02 1016MH: 02 1993downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:25AM0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELIN CONCRETE2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG4 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR8.1 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR9.4 ft. MGP - General Photograph - CORRODED REBAR12.6 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - LONG CIRCUM REBAR15.4 ft. MGO - General Observation - MH CONN 9:00 ACTIVE LARGE OUTGOING LINE15.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE15.4 ft. MGO - General Observation - MH CONN 3:00 ACTIVE LARGE IN COMING LINE15.4 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG15.8 ft. AMH - Downstream Manhole, Survey Ends - 2:35AM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELIN CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELIN CONCRETE

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR

    4 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - LONG CIRCUM REBAR

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR

    8.1 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: NO - LONG CIRCUM REBAR

  • General Photograph - CORRODED REBAR

    9.4 ft. - General Photograph - CORRODED REBAR

Observations (14)

DistanceCodeObservation
0MWM
15.8AMH2:35AM
15.4MGOMH CONN 9:00 ACTIVE LARGE OUTGOING LINE
12.6SRCLONG CIRCUM REBAR
8.1SRCLONG CIRCUM REBAR
15.4SSSBLISTERING PEELING CONCRETE
2SSSBLISTERING PEELIN CONCRETE
2SAMSEVERE AGG
15.4MGOMH CONN 3:00 ACTIVE LARGE IN COMING LINE
0AMH2:25AM
4SRCLONG CIRCUM REBAR
9.4MGPCORRODED REBAR
15.4SAMSEVERE AGG
0MWL

Properties (6)

custom_field_three
LONG & CIRCUM REBAR CORRODED
custom_field_two
2
customer
LACSD
datetime
2019-12-16T02:12:24-08:00
documentation
MARTIN,REVELES,IGNACIO
is_lateral_inspection
false