Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 13, 2019, 05:43 PM
  • 15 0334_15 0333_12132019_Manual2.mp4

Date
12/13/2019
W/O
0802971
Weather
Dry
Operator/Surveyor
BRAR
Sewer ID
Z00598
PipeID
P20165
Time
9:43 AM
Certificate
U-0618-07030022
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I 0295
Sewer Name
15 BALDWIN PARK TRUNK
City
LA PUENTE
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
23
Purpose
Routine Assessment
Project
20191213SB_BALDWIN_PARK_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
15 0333
Downstream MH
15 0334
Dir. of Survey
Upstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
3
Structural Quick
5132
Structural Rating
13
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
3
Overall Quick
Overall Rating
14
Pipe schematic from manhole 15 0333 to 15 0334
MH: 15 0333MH: 15 0334upstream0 ft. MSA - Survey Abandoned - VIEW OF UPLEG SIPHON AT D/S0.1 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES0.1 ft. SRC - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES0.1 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: YES0.1 ft. SAP - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: YES2 ft. MGO - General Observation - EAST UPLEG OF SIPHON2 ft. MWL - Water Level, 100 %of cross sectional area2 ft. VC - Vermin Cockroach, within 8 inches of joint: NO2 ft. AMH - Downstream Manhole, Survey Begins - 951 AM

Observation photos (1)

  • Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES

    1.9 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: YES

Observations (9)

DistanceCodeObservation
1.9SSS
1.9SRC
0MGOEAST UPLEG OF SIPHON
0MWL
0VC
0AMH951 AM
1.9SAV
2MSAVIEW OF UPLEG SIPHON AT D/S
1.9SAP

Properties (7)

additional_info
U-0618-0703002249. EAST BARREL
custom_field_three
REBAR VISIBLE CORREDED, AGGREGATE PROJECTING
custom_field_two
2
customer
LACSD
datetime
2019-12-13T09:43:02-08:00
documentation
BRAR, RUVALCABA, CASTILLO
is_lateral_inspection
false