Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 25, 2019, 11:40 AM
  • 02 2320_02 1358 _11252019_035851.mp4

Date
11/25/2019
W/O
798113
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00277
PipeID
P03882
Time
3:40 AM
Certificate
U-115-0622794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6828
Sewer Name
02 JANE STREET BRANCH TRUNK
City
E LOS ANGELES
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
11A
Purpose
Routine Assessment
Project
RFIR_WO_798113_TV02343_NOV2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
02 2320
Downstream MH
02 1358
Dir. of Survey
Downstream
Length Surveyed
353.6 ft.
Total Length
353.6 ft.
Structural Index
3
Structural Quick
413K
Structural Rating
184
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
322
Pipe schematic from manhole 02 2320 to 02 1358
MH: 02 2320MH: 02 1358downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 02 23200 ft. MWM - Water Mark, 30 %of cross sectional area7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start44.2 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES54.8 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start125.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"129.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"226.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"229.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"324.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"328.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"353.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish353.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish353.6 ft. AMH - Downstream Manhole, Survey Ends - 02 1358

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    44.2 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    54.8 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
353.6AMH02 1358
229.5TFC
7DAGS
0MWL
353.4CM
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
125.8TFC
328.1TFC
129.6TF
0AMH02 2320
44.2FM
54.8CM
324.5TFC
353.4DAGS
0MWM
226.5TFC

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-11-25T03:40:46-08:00
documentation
PRO PIPE
is_lateral_inspection
false