Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 9, 2019, 10:49 AM
  • 22 0565_22 0564 _09092019_040444.mp4

Date
09/09/2019
W/O
787674
Weather
Dry
Operator/Surveyor
J. VARGAS
Sewer ID
Z00791
PipeID
P16908
Time
3:49 AM
Certificate
U-209-8149
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6957
Sewer Name
22 BEN LOMOND TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Routine Assessment
Project
WO_787674_TV22006_SEP2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0565
Downstream MH
22 0564
Dir. of Survey
Downstream
Length Surveyed
214.7 ft.
Total Length
214.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2111
O&M Rating
3
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole 22 0565 to 22 0564
MH: 22 0565MH: 22 0564downstream0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 22 05650 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area3.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start7.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"13.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"63.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"68.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"85.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"124.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"139.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"160.5 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"212.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish212.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish214.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0564214.7 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observations (18)

DistanceCodeObservation
3.9SAP
63.6TFC
212.6SAP
160.5TBA
68.9TFC
3.9DAGS
0VC
0AMH22 0565
7.9TFC
85.5TFA
0MWL
124.4TF
214.7AMH22 0564
13.3TFC
214.7MGOCONNECTION AT MH 3 O'CLOCK
212.6DAGS
0MWM
139.5TFC

Properties (6)

additional_info
SC378564
custom_field_two
3
customer
LACSD
datetime
2019-09-09T03:49:35-07:00
documentation
PRO PIPE
is_lateral_inspection
false