Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 19, 2019, 09:09 AM
  • 22 0552_22 0551 _09192019_025034.mp4

Date
09/19/2019
W/O
787674
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00791
PipeID
P16894
Time
2:09 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K6081
Sewer Name
22 BEN LOMOND TRUNK
City
GLENDORA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
20
Purpose
Routine Assessment
Project
WO_787674_TV22006_SEP2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0552
Downstream MH
22 0551
Dir. of Survey
Downstream
Length Surveyed
439.7 ft.
Total Length
439.7 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2211
O&M Rating
5
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 22 0552 to 22 0551
MH: 22 0552MH: 22 0551downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 6 O'CLOCK0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 22 05522 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start18 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"66.2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - asphalt87.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"87.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - asphalt137 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"185.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6", 6"238.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"287.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"336.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"386.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"436.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish436.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish439.7 ft. AMH - Downstream Manhole, Survey Ends - 22 0551

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - asphalt

    66.2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - asphalt

Observations (20)

DistanceCodeObservation
2SAV
0MWM
0MWL
185.9TFC
0MGOCONNECTION AT MH 6 O'CLOCK
436.8SAV
287.7TFC
238.8TFC
0VC
2DAGS
66.2DSZasphalt
87.6TFC
436.8DAGS
336.9TFC
87.6DSZasphalt
386.7TF
439.7AMH22 0551
137TFC
18TB
0AMH22 0552

Properties (6)

additional_info
SC378428
custom_field_two
3
customer
LACSD
datetime
2019-09-19T02:09:12-07:00
documentation
PRO PIPE
is_lateral_inspection
false