Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 11, 2019, 07:30 AM
  • 30 0328_30 0327 _12102019_233713.mp4

Date
12/10/2019
W/O
798601
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00878
PipeID
P18001
Time
11:30 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7207
Sewer Name
30 SOUTH BAY CITIES MAIN TRUNK
City
TORRANCE
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 30
Page No.
05
Purpose
Routine Assessment
Project
WO_798601_TV30036_NOV2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
30 0328
Downstream MH
30 0327
Dir. of Survey
Downstream
Length Surveyed
201 ft.
Total Length
201 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
1
O&M Quick
1100
O&M Rating
1
Overall Index
2
Overall Quick
Overall Rating
3
Pipe schematic from manhole 30 0328 to 30 0327
MH: 30 0328MH: 30 0327downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 30 03282.7 ft. RFJ - Roots Fine Joint, from 02 to 05 o'clock, within 8 inches of joint: YES77.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"151 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"165.4 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES201 ft. MGO - General Observation - CONNECTION AT MH 12 O'CLOCK201 ft. AMH - Downstream Manhole, Survey Ends - 30 0327

Observation photos (1)

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    165.4 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

Observations (9)

DistanceCodeObservation
0MWM
201MGOCONNECTION AT MH 12 O'CLOCK
2.7RFJ
0MWL
165.4CL
77.1TF
201AMH30 0327
0AMH30 0328
151TF

Properties (6)

additional_info
SC365800
custom_field_two
4
customer
LACSD
datetime
2019-12-10T23:30:06-08:00
documentation
PROPIPE
is_lateral_inspection
false