Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 12, 2019, 07:59 AM
  • B 0565_B 0564 _12122019_001711.mp4

Date
12/11/2019
W/O
798600
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00101
PipeID
P09113
Time
11:59 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7151
Sewer Name
B JOINT OUTFALL B - UNIT 7
City
ROSEMEAD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
26
Purpose
Routine Assessment
Project
WO_798600_TV15120_NOV2019
Sewer Type
Gravity
Material
CIP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
B 0564
Downstream MH
B 0565
Dir. of Survey
Upstream
Length Surveyed
346.2 ft.
Total Length
346.2 ft.
Structural Index
3
Structural Quick
3M00
Structural Rating
207
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
207
Pipe schematic from manhole B 0564 to B 0565
MH: B 0564MH: B 0565upstream0 ft. AMH - Upstream Manhole, Survey Ends - B 05650 ft. MGO - General Observation - COCKROACHES IN MANHOLE1.5 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish344.2 ft. SCP - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start346.2 ft. MWL - Water Level, 15 %of cross sectional area346.2 ft. MWM - Water Mark, 15 %of cross sectional area346.2 ft. AMH - Upstream Manhole, Survey Begins - B 0565

Observation photos (2)

  • Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Corrosion Metal Pipe, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    346.2 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (7)

DistanceCodeObservation
346.2AMHB 0565
344.7SCP
0MWL
0MWM
2SCP
346.2MGOCOCKROACHES IN MANHOLE
0AMHB 0565

Properties (6)

additional_info
SC378883
custom_field_two
2
customer
LACSD
datetime
2019-12-11T23:59:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false