Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 25, 2019, 10:37 AM
  • 02 1361_02 1360 _11252019_025256.mp4

Date
11/25/2019
W/O
798190
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00277
PipeID
P03884
Time
2:37 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6829
Sewer Name
02 JANE STREET BRANCH TRUNK
City
E LOS ANGELES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
11A
Purpose
Routine Assessment
Project
RFIR_WO_798190_TV02342_NOV2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
02 1361
Downstream MH
02 1360
Dir. of Survey
Downstream
Length Surveyed
268.5 ft.
Total Length
268.5 ft.
Structural Index
3
Structural Quick
3I00
Structural Rating
156
O&M Index
2
O&M Quick
2J00
O&M Rating
106
Overall Index
3
Overall Quick
Overall Rating
262
Pipe schematic from manhole 02 1361 to 02 1360
MH: 02 1361MH: 02 1360downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 13610 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES14.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start24.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"79 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"109 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"142 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"175.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"232.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 8"267.8 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish267.8 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish268.5 ft. AMH - Downstream Manhole, Survey Ends - 02 1360

Observation photos (3)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    5.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    14.8 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
14.8CM
109TF
0AMH02 1361
175.3TF
267.8CM
24.9TF
267.8DAGS
0MWM
232.6TF
0MWL
5.8CM
142TF
79TF
2DAGS
268.5AMH02 1360

Properties (5)

custom_field_two
3
customer
LACSD
datetime
2019-11-25T02:37:40-08:00
documentation
PRO PIPE
is_lateral_inspection
false