Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 13, 2019, 05:17 PM
  • 15 0062_15 0061_12132019_095411.mp4

Date
12/13/2019
W/O
798599
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00622
PipeID
P11956
Time
9:17 AM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6833
Sewer Name
15 PUENTE TRUNK
City
CITY OF INDUSTRY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_798599_TV15206_NOV2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
10 in.
Width
10 in.
Upstream MH
15 0062
Downstream MH
15 0061
Dir. of Survey
Downstream
Length Surveyed
414.8 ft.
Total Length
414.8 ft.
Structural Index
2
Structural Quick
5141
Structural Rating
79
O&M Index
2
O&M Quick
413C
O&M Rating
346
Overall Index
2
Overall Quick
Overall Rating
425
Pipe schematic from manhole 15 0062 to 15 0061
MH: 15 0062MH: 15 0061downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 00627 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start21.6 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start25.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"26.4 ft. FS - Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES33 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start48.2 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish51 ft. FM - Fracture Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES52.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"75.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"102.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"125.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"151.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"165.1 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Start176 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"202.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"221.8 ft. MWLS - Water Level, Sag in pipe, 10 %of cross sectional area, Finish225.2 ft. FS - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES229.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"245.8 ft. CC - Crack Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES253 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - POSSIBLY CAPPED279.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6"297.5 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6"299.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"306.5 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish306.5 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES306.5 ft. DAE - Deposits Attached Encrustation, 20 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES307.2 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Start332.2 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Start384.2 ft. HVV - Hole Void Visible, from 11 to 01 o'clock, within 8 inches of joint: YES411.1 ft. MWLS - Water Level, Sag in pipe, 15 %of cross sectional area, Finish411.1 ft. DAE - Deposits Attached Encrustation, 15 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Finish413.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish414.8 ft. AMH - Downstream Manhole, Survey Ends - 15 0061

Observation photos (13)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    21.6 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

    26.4 ft. - Fracture Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 10 %of cross sectional area, Start

    33 ft. - Water Level, Sag in pipe, 10 %of cross sectional area, Start

  • Fracture Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES

    51 ft. - Fracture Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 10 %of cross sectional area, Start

    165.1 ft. - Water Level, Sag in pipe, 10 %of cross sectional area, Start

  • Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES

    225.2 ft. - Fracture Spiral, from 01 to 04 o'clock, within 8 inches of joint: YES

  • Crack Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES

    245.8 ft. - Crack Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    306.5 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 20 %of cross sectional area, from 10 to 02 o'clock,  , within 8 inches of joint: YES

    306.5 ft. - Deposits Attached Encrustation, 20 %of cross sectional area, from 10 to 02 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 15 %of cross sectional area, from 11 to 01 o'clock,  , within 8 inches of joint: YES, Start

    307.2 ft. - Deposits Attached Encrustation, 15 %of cross sectional area, from 11 to 01 o'clock, , within 8 inches of joint: YES, Start

  • Water Level, Sag in pipe, 15 %of cross sectional area, Start

    332.2 ft. - Water Level, Sag in pipe, 15 %of cross sectional area, Start

  • Hole Void Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

    384.2 ft. - Hole Void Visible, from 11 to 01 o'clock, within 8 inches of joint: YES

Observations (37)

DistanceCodeObservation
306.5DAE
48.2MWLS
25.3TFC
7DAGS
413.6DAGS
26.4FS
306.5FL
75.4TFC
176TFC
411.1MWLS
0MGOCONNECTION AT MH 9 O'CLOCK
0MWL
306.5DAE
384.2HVV
332.2MWLS
165.1MWLS
151.9TF
279.2TF
52.3TFC
125.5TFC
297.5TB
102.2TFC
245.8CC
0MWM
225.2FS
414.8AMH15 0061
21.6DAE
202.5TFC
221.8MWLS
33MWLS
229.2TFC
253TFPOSSIBLY CAPPED
307.2DAE
0AMH15 0062
299.7TFC
411.1DAE
51FM

Properties (5)

custom_field_two
1
customer
LACSD
datetime
2019-12-13T09:17:09-08:00
documentation
PRO PIPE
is_lateral_inspection
false