Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 9, 2019, 09:45 AM
  • H 1336_H 1335 _12092019_020749.mp4

Date
12/09/2019
W/O
798192
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01184
PipeID
P25879
Time
1:45 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7145
Sewer Name
H JOINT OUTFALL H - UNIT 8L RELIEF
City
AZUSA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
12
Purpose
Routine Assessment
Project
WO_798192_TV22099_NOV2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1336
Downstream MH
H 1335
Dir. of Survey
Downstream
Length Surveyed
540.2 ft.
Total Length
540.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2j00
O&M Rating
430
Overall Index
2
Overall Quick
Overall Rating
430
Pipe schematic from manhole H 1336 to H 1335
MH: H 1336MH: H 1335downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 13360 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERAL288.1 ft. ISZ - Intruding Sealing Other, 5 %of cross sectional area, from 10 to 03 o'clock538.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish538.3 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish540.2 ft. AMH - Downstream Manhole, Survey Begins - H 1335

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - MINERAL

    2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - MINERAL

  • Intruding Sealing Other, 5 %of cross sectional area, from 10 to 03 o'clock

    288.1 ft. - Intruding Sealing Other, 5 %of cross sectional area, from 10 to 03 o'clock

Observations (9)

DistanceCodeObservation
0MWL
538.3DAGS
2DAGS
2DAZMINERAL
288.1ISZ
0AMHH 1336
538.3DAZ
540.2AMHH 1335
0MWM

Properties (7)

additional_info
SC378877
custom_field_two
4
customer
LACSD
datetime
2019-12-09T01:45:59-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
39562