Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 17, 2019, 10:05 AM
  • H 0610_H 0609 _12172019_022757.mp4

Date
12/17/2019
W/O
798664
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00190
PipeID
P11031
Time
2:05 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7154
Sewer Name
H JOINT OUTFALL H - UNIT 8G
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
RFIR_WO_798664_TV15233_NOV2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
H 0610
Downstream MH
H 0609
Dir. of Survey
Downstream
Length Surveyed
578.7 ft.
Total Length
578.7 ft.
Structural Index
3
Structural Quick
3V2V
Structural Rating
575
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
575
Pipe schematic from manhole H 0610 to H 0609
MH: H 0610MH: H 0609downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 06100 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start14.7 ft. MGO - General Observation - MAG COATING THROUGHOUT280.8 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"577.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish577.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish578.7 ft. AMH - Downstream Manhole, Survey Ends - H 0609

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0AMHH 0610
577.1SSS
0MWL
578.7AMHH 0609
14.7MGOMAG COATING THROUGHOUT
0MWM
577.1SAP
2SAP
280.8TBA
2SSS

Properties (7)

additional_info
SC378886
custom_field_two
3
customer
LACSD
datetime
2019-12-17T02:05:38-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
27198