Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 17, 2019, 06:00 AM
  • H 0604_H 0603 _12162019_222326.mp4

Date
12/16/2019
W/O
798664
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00190
PipeID
P11025
Time
10:00 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7154
Sewer Name
H JOINT OUTFALL H - UNIT 8G
City
BALDWIN PARK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Resurvey For Any Reason
Project
RFIR_WO_798664_TV15233_NOV2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
H 0604
Downstream MH
H 0603
Dir. of Survey
Downstream
Length Surveyed
614.2 ft.
Total Length
614.2 ft.
Structural Index
3
Structural Quick
5M3W
Structural Rating
970
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
970
Pipe schematic from manhole H 0604 to H 0603
MH: H 0604MH: H 0603downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 06040 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start363.6 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish611.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish611.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish614.2 ft. AMH - Downstream Manhole, Survey Ends - H 0603

Observation photos (3)

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
611.2SAP
2SRV
0MWM
2SSS
0MWL
2SAP
0AMHH 0604
614.2AMHH 0603
363.6SRV
611.2SSS
0MGOCONNECTION AT MH 9 O'CLOCK

Properties (7)

additional_info
SC378886
custom_field_two
2
customer
LACSD
datetime
2019-12-16T22:00:34-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
27198