Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 26, 2019, 10:50 AM
  • 22 0715_22 0714 _11262019_031440.mp4

Date
11/26/2019
W/O
798184
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00826
PipeID
P17069
Time
2:50 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7178
Sewer Name
22 SAN DIMAS CONNECTION EXTENSION TRUNK
City
SAN DIMAS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_798184_TV22167_NOV2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0715
Downstream MH
22 0714
Dir. of Survey
Downstream
Length Surveyed
286.4 ft.
Total Length
286.4 ft.
Structural Index
3
Structural Quick
3J2J
Structural Rating
280
O&M Index
2
O&M Quick
2J11
O&M Rating
113
Overall Index
2
Overall Quick
Overall Rating
393
Pipe schematic from manhole 22 0715 to 22 0714
MH: 22 0715MH: 22 0714downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 07150.1 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0.1 ft. MGO - General Observation - CONN @ MH 3 O' CLOCK/ACTIVE2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start108 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"174.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"284 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish284 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish284.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish285 ft. VC - Vermin Cockroach, within 8 inches of joint: YES - @ MH286.4 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE286.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0714

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
286.4MGOCONN @ MH 9 O'CLOCK/ACTIVE
2SSS
108TFC
3SAP
0MWM
2DAGS
284SSS
0MWL
0AMH22 0715
284DAGS
0.1MGOCONN @ MH 9 O'CLOCK/ACTIVE
0.1MGOCONN @ MH 3 O' CLOCK/ACTIVE
285VC@ MH
174.6TFC
286.4AMH22 0714
284.3SAP

Properties (6)

additional_info
SC398418
custom_field_two
3
customer
LACSD
datetime
2019-11-26T02:50:28-08:00
documentation
PROPIPE
is_lateral_inspection
false