Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 26, 2019, 07:45 AM
  • 22 0709A_22 0709 _11262019_000522.mp4

Date
11/25/2019
W/O
798184
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00826
PipeID
P17063
Time
11:45 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7178
Sewer Name
22 SAN DIMAS CONNECTION EXTENSION TRUNK
City
SAN DIMAS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
RFIR_WO_798184_TV22167_NOV2019
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0709A
Downstream MH
22 0709
Dir. of Survey
Downstream
Length Surveyed
162.1 ft.
Total Length
162.1 ft.
Structural Index
3
Structural Quick
513E
Structural Rating
165
O&M Index
2
O&M Quick
2E11
O&M Rating
65
Overall Index
2
Overall Quick
Overall Rating
230
Pipe schematic from manhole 22 0709A to 22 0709
MH: 22 0709AMH: 22 0709downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. AMH - Upstream Manhole, Survey Begins - 22 0709A0 ft. MWL - Water Level, 30 %of cross sectional area0.1 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - 70% MAG2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start106.5 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 6"154 ft. BSV - Broken Soil Visible, from 08 to 04 o'clock, within 8 inches of joint: YES161 ft. VC - Vermin Cockroach, within 8 inches of joint: YES - @ MH161 ft. SZ - Surface Other, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 70% MAG161 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish162.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish162.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish162.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0709162.1 ft. MGO - General Observation - INCORRECT DISTANCE ON DB

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Broken Soil Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

    154 ft. - Broken Soil Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
162.1SSS
162.1SAP
161VC@ MH
154BSV
0.1MWM
2.4SSS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
161SZ70% MAG
162.1AMH22 0709
161DAGS
106.5TFC
0AMH22 0709A
2SZ70% MAG
2.4SAP
162.1MGOINCORRECT DISTANCE ON DB
0MWL
2DAGS

Properties (6)

additional_info
SC398418
custom_field_two
1
customer
LACSD
datetime
2019-11-25T23:45:59-08:00
documentation
PROPIPE
is_lateral_inspection
false