Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 15, 2019, 08:31 AM
  • E 0030_E 0029_11152019_005211.mp4

Date
11/15/2019
W/O
792653
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00028
PipeID
P07613
Time
12:31 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7162
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_792653_TV01124_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
E 0029
Downstream MH
E 0030
Dir. of Survey
Upstream
Length Surveyed
152.4 ft.
Total Length
152.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
3100
O&M Rating
3
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole E 0029 to E 0030
MH: E 0029MH: E 0030upstream0 ft. DSC - Deposits Settled Compacted, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. MSA - Survey Abandoned - REVERSAL COMPLETED127.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start127.9 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVITY STATUS UNKNOWN @ THIS TIME144.5 ft. DSC - Deposits Settled Compacted, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start147.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start152.4 ft. MWM - Water Mark, 25 %of cross sectional area152.4 ft. MWL - Water Level, 25 %of cross sectional area152.4 ft. MGO - Reversal Inspection152.4 ft. AMH - Downstream Manhole, Survey Begins - E 0029

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    24.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
24.5SSS
0MWM
24.5TBACTIVITY STATUS UNKNOWN @ THIS TIME
152.4DSC
4.5SAP
7.9DSC
152.4SSS
0MWL
0MGO
152.4SAP
152.4MSAREVERSAL COMPLETED
0AMHE 0029

Properties (6)

additional_info
SC398402
custom_field_two
3
customer
LACSD
datetime
2019-11-15T00:31:36-08:00
documentation
PROPIPE
is_lateral_inspection
false