Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 18, 2019, 12:11 PM
  • E 0047_E 0046A_11182019_044232.mp4

Date
11/18/2019
W/O
792653
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00028
PipeID
P23537
Time
4:11 AM
Certificate
U-715-700070
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7164
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_792653_TV01124_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
E 0047
Downstream MH
E 0046A
Dir. of Survey
Downstream
Length Surveyed
162.7 ft.
Total Length
162.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
3121
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole E 0047 to E 0046A
MH: E 0047MH: E 0046Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - E 00470 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 45 %of cross sectional area2.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.8 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start112.1 ft. DSC - Deposits Settled Compacted, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO159.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish159.9 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish159.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish162.7 ft. AMH - Downstream Manhole, Survey Ends - E 0046A162.7 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (12)

DistanceCodeObservation
159.9SSS
0AMHE 0047
2.4SSS
0MWL
162.7AMHE 0046A
159.9DSC
112.1DSC
159.9SAP
0MWM
15.8DSC
2.4SAP
162.7MGOACTIVE CONNECTION AT MH 9 O'CLOCK

Properties (6)

additional_info
SC398404
custom_field_two
3
customer
LACSD
datetime
2019-11-18T04:11:03-08:00
documentation
PROPIPE
is_lateral_inspection
false