Wastewater/Activity/PacpInspection/1.0Nov 13, 2019, 08:37 AM
  • E 0057_E 0106_11132019_005149.mp4

Date
11/13/2019
W/O
792653
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00028
PipeID
P11287
Time
12:37 AM
Certificate
U-715-07070
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7160
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
LYNWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
13
Purpose
V
Project
RFIR_WO_792653_TV01124_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
E 0057
Downstream MH
E 0106
Dir. of Survey
Downstream
Length Surveyed
259 ft.
Total Length
259 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
245
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
245
Pipe schematic from manhole E 0057 to E 0106
MH: E 0057MH: E 0106downstream0 ft. AMH - Upstream Manhole, Survey Begins - E 00570 ft. MWL - Water Level, 40 %of cross sectional area0 ft. MWM - Water Mark, 45 %of cross sectional area11.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start167 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6"250.5 ft. TBB - Tap Break-In Abandoned, at 02 o'clock, -, within 8 inches of joint: NO, 6" - DEBRIS IN CONNECTION255.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish255.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish258 ft. MGO - General Observation - CAPPED CONNECTION @ D/S MH - 3 O'CLOCK259 ft. AMH - Downstream Manhole, Survey Ends - E 0106

Observation photos (2)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    11.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    11.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
259AMHE 0106
258MGOCAPPED CONNECTION @ D/S MH - 3 O'CLOCK
11.9SSS
250.5TBBDEBRIS IN CONNECTION
167TB
0AMHE 0057
0MWL
255.1SAP
11.9SAP
255.1SSS
0MWM

Properties (6)

additional_info
SC378695
custom_field_two
3
customer
LACSD
datetime
2019-11-13T00:37:35-08:00
documentation
PROPIPE
is_lateral_inspection
false