Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 13, 2019, 10:13 AM
  • E 0055_E 0054_11132019_153128.mp4

Date
11/13/2019
W/O
792653
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00028
PipeID
P11283
Time
2:13 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7160
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
LYNWOOD
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_792653_TV01124_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
E 0055
Downstream MH
E 0054
Dir. of Survey
Downstream
Length Surveyed
609.6 ft.
Total Length
609.6 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole E 0055 to E 0054
MH: E 0055MH: E 0054downstream0 ft. AMH - Upstream Manhole, Survey Begins - E 00550 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area10 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start590.3 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE CONNECTION608.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish608.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish609.6 ft. AMH - Downstream Manhole, Survey Ends - E 0054

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
0AMHE 0055
0MWM
0MWL
10SSS
608.3SAP
10SAP
608.3SSS
590.3TBACTIVE CONNECTION
609.6AMHE 0054

Properties (6)

additional_info
SC378695
custom_field_two
3
customer
LACSD
datetime
2019-11-13T02:13:18-08:00
documentation
PROPIPE
is_lateral_inspection
false