Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 15, 2019, 11:41 AM
  • E 0044_E 0043_11152019_035428.mp4

Date
11/15/2019
W/O
792653
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00028
PipeID
P11271
Time
3:41 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7162
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Routine Assessment
Project
RFIR_WO_792653_TV01124_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
E 0044
Downstream MH
E 0043
Dir. of Survey
Downstream
Length Surveyed
81.6 ft.
Total Length
81.8 ft.
Structural Index
3
Structural Quick
3B2B
Structural Rating
80
O&M Index
2
O&M Quick
312B
O&M Rating
35
Overall Index
2
Overall Quick
Overall Rating
115
Pipe schematic from manhole E 0044 to E 0043
MH: E 0044MH: E 0043downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 00443.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start3.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.2 ft. MGO - General Observation - CAMERA UNSTABLE DUE TO DEBRIS81.4 ft. OBR - Obstacles Rocks, 15 %of cross sectional area, from 04 to 07 o'clock81.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish81.6 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish81.6 ft. MSA - Survey Abandoned - CONCRETE81.6 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Compacted,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    3.9 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Rocks, 15 %of cross sectional area, from 04 to 07 o'clock

    81.4 ft. - Obstacles Rocks, 15 %of cross sectional area, from 04 to 07 o'clock

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    81.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (12)

DistanceCodeObservation
7.2MGOCAMERA UNSTABLE DUE TO DEBRIS
81.6SSS
3.9SSS
81.6DSC
0MWL
81.6MSACONCRETE
3.9DSC
81.6SAV
81.4OBR
0MWM
0AMHE 0044
3.9SAV

Properties (6)

additional_info
SC398402
custom_field_two
5
customer
LACSD
datetime
2019-11-15T03:41:10-08:00
documentation
PROPIPE
is_lateral_inspection
false