Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 15, 2019, 07:10 AM
  • E 0030_E 0029_11142019_235420.mp4

Date
11/14/2019
W/O
792653
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00028
PipeID
P07613
Time
11:10 PM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7162
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
19
Purpose
Routine Assessment
Project
RFIR_WO_792653_TV01124_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
54 in.
Width
54 in.
Upstream MH
E 0030
Downstream MH
E 0029
Dir. of Survey
Downstream
Length Surveyed
501.7 ft.
Total Length
501.7 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole E 0030 to E 0029
MH: E 0030MH: E 0029downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 00303.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start15.2 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start15.3 ft. MGO - General Observation - CAMERA UNSTABLE DUE TO DEBRIS501.7 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish501.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish501.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish501.7 ft. MSA - Survey Abandoned - DEBRIS

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
501.7DSC
501.7SAP
15.3MGOCAMERA UNSTABLE DUE TO DEBRIS
0MWM
3.9SAP
15.2DSC
0MWL
0AMHE 0030
501.7SSS
501.7MSADEBRIS
3.9SSS

Properties (6)

additional_info
SC398402
custom_field_two
5
customer
LACSD
datetime
2019-11-14T23:10:03-08:00
documentation
PROPIPE
is_lateral_inspection
false