H 1209_H 1208 _10102019_003213.mp4

0 ft. - Upstream Manhole, Survey Begins - H 1209

0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

27 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

27 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
147.5 ft. - Water Level, Sag in pipe, 40 %of cross sectional area, Start

218 ft. - Water Level, Sag in pipe, 15 %of cross sectional area
472.7 ft. - Water Level, Sag in pipe, 40 %of cross sectional area, Start
| Distance | Code | Observation |
|---|---|---|
| 2 | MGO | MAG COAT THROUGHOUT |
| 0 | MWL | — |
| 521 | DAGS | — |
| 147.5 | MWLS | — |
| 414.2 | MWLS | — |
| 521.6 | AMH | H 1208 |
| 518.6 | DAGS | — |
| 218 | MWLS | — |
| 518.2 | MGO | MAG COAT THROUGHOUT END |
| 521 | SAV | — |
| 521 | SSS | — |
| 27 | SSS | — |
| 2 | DAGS | — |
| 0 | AMH | H 1209 |
| 0 | DAGS | — |
| 495.6 | MWLS | — |
| 472.7 | MWLS | — |
| 0 | MWM | — |
| 27 | SAV | — |