Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 8, 2019, 05:41 AM
  • H 1230_H 1229 _10072019_215611.mp4

Date
10/07/2019
W/O
792811
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z01182
PipeID
P17654
Time
10:41 PM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6099
Sewer Name
H JOINT OUTFALL H - UNIT 8K RELIEF
City
AZUSA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
WO_792811_TV15041_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1230
Downstream MH
H 1229
Dir. of Survey
Downstream
Length Surveyed
214.1 ft.
Total Length
214.1 ft.
Structural Index
2
Structural Quick
3G2G
Structural Rating
202
O&M Index
2
O&M Quick
412G
O&M Rating
92
Overall Index
2
Overall Quick
Overall Rating
294
Pipe schematic from manhole H 1230 to H 1229
MH: H 1230MH: H 1229downstream0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 12300 ft. MWL - Water Level, 35 %of cross sectional area7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start10 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start13 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start17.4 ft. MGO - General Observation - MAG COATING THROUGHOUT PIPE140 ft. LR - Alignment Right, 10 %, Start165 ft. MWL - Water Level, 45 %of cross sectional area169 ft. LR - Alignment Right, 10 %, Finish214 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish214 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish214 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish214.1 ft. AMH - Downstream Manhole, Survey Ends - H 1229

Observation photos (6)

  • Upstream Manhole, Survey Begins - H 1230

    0 ft. - Upstream Manhole, Survey Begins - H 1230

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    10 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    13 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Alignment Right, 10 %, Start

    140 ft. - Alignment Right, 10 %, Start

  • Water Level, 45 %of cross sectional area

    165 ft. - Water Level, 45 %of cross sectional area

Observations (14)

DistanceCodeObservation
17.4MGOMAG COATING THROUGHOUT PIPE
169LR
7DAGS
214SSS
214.1AMHH 1229
214SAP
165MWL
0MWM
214DAGS
0AMHH 1230
10SSS
13SAP
140LR
0MWL

Properties (7)

additional_info
SC378446
custom_field_two
3
customer
LACSD
datetime
2019-10-07T22:41:08-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
30904