Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 8, 2019, 07:55 AM
  • H 1227_H 1226 _10082019_003150.mp4

Date
10/08/2019
W/O
792811
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z01182
PipeID
P17651
Time
12:55 AM
Certificate
U-109-7948
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K6099
Sewer Name
H JOINT OUTFALL H - UNIT 8K RELIEF
City
AZUSA
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
19
Purpose
Routine Assessment
Project
WO_792811_TV15041_OCT2019
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
H 1227
Downstream MH
H 1226
Dir. of Survey
Downstream
Length Surveyed
551.1 ft.
Total Length
551.1 ft.
Structural Index
3
Structural Quick
3U2U
Structural Rating
545
O&M Index
2
O&M Quick
412U
O&M Rating
220
Overall Index
2
Overall Quick
Overall Rating
765
Pipe schematic from manhole H 1227 to H 1226
MH: H 1227MH: H 1226downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 55 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 12272 ft. MGO - General Observation - MAG COATING THROUGHOUT PIPE6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start52 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4"96 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4"168.9 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4"240.8 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4"315.4 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4"351.6 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4"391 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 4"551 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish551 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish551 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish551.1 ft. AMH - Downstream Manhole, Survey Ends - H 1226

Observation photos (3)

  • Upstream Manhole, Survey Begins - H 1227

    0 ft. - Upstream Manhole, Survey Begins - H 1227

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
351.6TB
0MWL
551SSS
168.9TB
0MWM
6SSS
315.4TB
6SAP
551DAGS
0AMHH 1227
551SAP
96TB
9.1DAGS
551.1AMHH 1226
2MGOMAG COATING THROUGHOUT PIPE
52TB
391TB
240.8TB

Properties (7)

additional_info
SC378446
custom_field_two
3
customer
LACSD
datetime
2019-10-08T00:55:37-07:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
30904