Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 22, 2019, 08:11 AM
  • A 0843_C 0569_11222019_002902.mp4

Date
11/22/2019
W/O
798188
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00362
PipeID
P05252
Time
12:11 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7174
Sewer Name
C JOINT OUTFALL C - UNIT 4D
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
08
Purpose
Routine Assessment
Project
RFIR_WO_798188_TV03084_NOV2019
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
27 in.
Width
27 in.
Upstream MH
A 0843
Downstream MH
C 0569
Dir. of Survey
Downstream
Length Surveyed
340 ft.
Total Length
340 ft.
Structural Index
3
Structural Quick
3Y2M
Structural Rating
529
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
663
Pipe schematic from manhole A 0843 to C 0569
MH: A 0843MH: C 0569downstream0 ft. MWM - Water Mark, 45 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - A 08430 ft. MWL - Water Level, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES19.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start337 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish337 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish337 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish338.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish340 ft. AMH - Downstream Manhole, Survey Ends - C 0569

Observation photos (2)

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    5 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    19.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
2DAGS
338.9CM
337SSS
19.2CM
2SSS
0MWM
340AMHC 0569
337DAGS
0AMHA 0843
5CL
0MWL
337CM
2CM

Properties (6)

additional_info
SC398414
custom_field_two
3
customer
LACSD
datetime
2019-11-22T00:11:16-08:00
documentation
PROPIPE
is_lateral_inspection
false