Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 22, 2019, 09:50 AM
  • 32 1328_32 1327_11222019_015731.mp4

Date
11/22/2019
W/O
798662
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z01119
PipeID
P24959
Time
1:50 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K7135
Sewer Name
32 DISTRICT #26 INTERCEPTOR RELIEF TRUNK
City
SANTA CLARITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_798662_TV32043_NOV2019
Sewer Type
Gravity
Material
PEP
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
32 1328
Downstream MH
32 1327
Dir. of Survey
Downstream
Length Surveyed
211.5 ft.
Total Length
211.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
412P
O&M Rating
170
Overall Index
2
Overall Quick
Overall Rating
170
Pipe schematic from manhole 32 1328 to 32 1327
MH: 32 1328MH: 32 1327downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 13280 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start - MINERAL2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start210.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish210.1 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish211.5 ft. AMH - Downstream Manhole, Survey Ends - 32 1327

Observation photos (2)

  • Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start - MINERAL

    2 ft. - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start - MINERAL

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (8)

DistanceCodeObservation
0AMH32 1328
2DAZMINERAL
211.5AMH32 1327
2DAGS
0MWL
0MWM
210.1DAGS
210.1DAZ

Properties (7)

additional_info
SC378867
custom_field_two
4
customer
LACSD
datetime
2019-11-22T01:50:37-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
37698