Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 9, 2019, 12:34 PM
  • Section#7_22 0736_22 0713__1292019__I0286.mp4

Date
12/09/2019
W/O
0798221
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00821
PipeID
P17092
Time
4:34 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
I0286
Sewer Name
22 PUDDINGSTONE TRUNK, SECTS 1&2
City
SAN DIMAS
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
23
Purpose
Capital Improvement Program Assesment
Project
20191207MDM_PUDDINGSTONE_TRUNK_SECTS_1_2
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0736
Downstream MH
22 0713
Dir. of Survey
Downstream
Length Surveyed
334.9 ft.
Total Length
334.9 ft.
Structural Index
3
Structural Quick
4M2L
Structural Rating
406
O&M Index
3
O&M Quick
5131
O&M Rating
9
Overall Index
3
Overall Quick
Overall Rating
415
Pipe schematic from manhole 22 0736 to 22 0713
MH: 22 0736MH: 22 0713downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:40AM0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED SPORATIC18.7 ft. MGO - General Observation - MAG COAT 25% START55.8 ft. RMJ - Roots Medium Joint, from 08 to 04 o'clock, 10 %, within 8 inches of joint: YESR77.9 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE79.5 ft. RFJ - Roots Fine Joint, from 09 to 03 o'clock, within 8 inches of joint: YESR - 2%100.8 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG182 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - OPEN285.4 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - OPEN305.5 ft. MWL - Water Level, 40 %of cross sectional area315.6 ft. MWM - Water Mark, 80 %of cross sectional area334.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED SPORATIC334.6 ft. MGO - General Observation - MH CONN 3:00 ACTIVE334.6 ft. MGO - General Observation - MH CONN 3:00 ACTIVE334.6 ft. MGO - General Observation - MH CONN 1:00 OPEN PARTIAL STOPLOG IN PLACE334.6 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG334.9 ft. AMH - Downstream Manhole, Survey Ends - 5:10AM

Observation photos (8)

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED SPORATIC

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED SPORATIC

  • General Observation - MAG COAT 25% START

    18.7 ft. - General Observation - MAG COAT 25% START

  • Roots Medium Joint, from 08 to 04 o'clock, 10 %, within 8 inches of joint: YESR

    55.8 ft. - Roots Medium Joint, from 08 to 04 o'clock, 10 %, within 8 inches of joint: YESR

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    100.8 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Water Level, 40 %of cross sectional area

    305.5 ft. - Water Level, 40 %of cross sectional area

  • Water Mark, 80 %of cross sectional area

    315.6 ft. - Water Mark, 80 %of cross sectional area

  • General Observation - MH CONN 1:00 OPEN PARTIAL STOPLOG IN PLACE

    334.6 ft. - General Observation - MH CONN 1:00 OPEN PARTIAL STOPLOG IN PLACE

Observations (20)

DistanceCodeObservation
334.9AMH5:10AM
334.6SSSPEELING CONCRETE SEVERE AGG ATTACHED SPORATIC
0AMH4:40AM
334.6MGOMH CONN 3:00 ACTIVE
182TFOPEN
0MWM
100.8SAMSEVERE AGG
55.8RMJ
334.6MGOMH CONN 3:00 ACTIVE
2SAMSEVERE AGG
305.5MWL
334.6MGOMH CONN 1:00 OPEN PARTIAL STOPLOG IN PLACE
334.6SAMSEVERE AGG
18.7MGOMAG COAT 25% START
315.6MWM
2SSSPEELING CONCRETE SEVERE AGG ATTACHED SPORATIC
0MWL
77.9TFACTIVE
285.4TFOPEN
79.5RFJ2%

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED SPORATIC
custom_field_two
2
customer
LACSD
datetime
2019-12-09T04:34:10-08:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO
is_lateral_inspection
false