Search
Uploads
Inspections
Wastewater/Activity/PacpInspection/1.0
Nov 21, 2019, 12:41 PM
18 0958_18 0957_11212019_044352.mp4
Date
11/21/2019
W/O
0798462
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00716
PipeID
P14806
Time
4:41 AM
Certificate
1014-06022543
System Owner
LACSD
Date Cleaned
—
Pre-Cleaning
Not Known
Media Label
H1316
Sewer Name
18 WORSHAM CREEK TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
10
Purpose
Routine Assessment
Project
20191121MDM_WORSHAM_CREEK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
9.399999618530273 in.
Upstream MH
18 0958
Downstream MH
18 0957
Dir. of Survey
Downstream
Length Surveyed
284.1 ft.
Total Length
284.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
—
Overall Rating
4
Pipe schematic from manhole 18 0958 to 18 0957
MH: 18 0958
MH: 18 0957
downstream
0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active
0 ft. MWL - Water Level, 20 %of cross sectional area
0 ft. MWM - Water Mark, 50 %of cross sectional area
0 ft. AMH - Upstream Manhole, Survey Begins - 4:45AM
2 ft. MGO - General Observation - 10" VCP-PVCP LINER
5.5 ft. TB - Tap Break-In, at 09 o'clock, -, within 8 inches of joint: NO, 6" - Open
284.1 ft. AMH - Downstream Manhole, Survey Ends - 5:00AM
Observation photos (1)
2 ft. - General Observation - 10" VCP-PVCP LINER
All inspections of P14806
Work order 0798462
Observations (7)
Distance
Code
Observation
0
MGO
Conn. @ Mh, 3 O' Clock. Active
2
MGO
10" VCP-PVCP LINER
284.1
AMH
5:00AM
5.5
TB
Open
0
MWL
—
0
MWM
—
0
AMH
4:45AM
Properties (7)
custom_field_three
LINER GOOD COND
custom_field_two
4
customer
LACSD
datetime
2019-11-21T04:41:13-08:00
documentation
MARTIN,REVELES,OLIVER 111,CASTILLO
is_lateral_inspection
false
lining
PVCP