Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 3, 2019, 09:58 AM
  • Section#3_22 0626_22 0625__1232019__I0276.mp4

Date
12/03/2019
W/O
0806003
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00827
PipeID
P16974
Time
1:58 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0276
Sewer Name
22 SUNFLOWER TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
21
Purpose
Capital Improvement Program Assesment
Project
20191203MDM_SUNFLOWER_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
22 0626
Downstream MH
22 0625
Dir. of Survey
Downstream
Length Surveyed
323.8 ft.
Total Length
323.8 ft.
Structural Index
3
Structural Quick
5B4L
Structural Rating
560
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
560
Pipe schematic from manhole 22 0626 to 22 0625
MH: 22 0626MH: 22 0625downstream0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:30PM0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG7.9 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG9.4 ft. SMW - Surface Missing Wall, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SOIL VISIBLE VOID START9.4 ft. SMW - Surface Missing Wall, from 09 to 03 o'clock, within 8 inches of joint: YES - VOID SOIL SAND & ROCK VISIBLE11.3 ft. SMW - Surface Missing Wall, from 08 to 11 o'clock, within 8 inches of joint: YES - DEEP VOID12.5 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG & CONCRETE12.5 ft. SMW - Surface Missing Wall, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - VOID SOIL VISIBLE14.7 ft. SMW - Surface Missing Wall, from 02 to 03 o'clock, within 8 inches of joint: YES - VOID SOIL VISIBLE17.3 ft. SMW - Surface Missing Wall, from 12 to 03 o'clock, within 8 inches of joint: YES, Start - VOID SOIL VISIBLE17.3 ft. SMW - Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL VISIBLE20.3 ft. SMW - Surface Missing Wall, from 12 to 03 o'clock, within 8 inches of joint: YES, Finish - VOID SOIL VISIBLE20.5 ft. SMW - Surface Missing Wall, from 01 to 04 o'clock, within 8 inches of joint: YES - SOIL VISIBLE21.7 ft. SMW - Surface Missing Wall, from 01 to 03 o'clock, within 8 inches of joint: NO, - SOIL VISIBLE APPOX 2.5' LONG21.8 ft. SMW - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - VOID SOIL VISIBLE25 ft. SMW - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES, Finish - VOID SOIL VISIBLE26 ft. SMW - Surface Missing Wall, from 12 to 01 o'clock, within 8 inches of joint: NO - SOIL VISIBLE28.5 ft. SMW - Surface Missing Wall, from 12 to 02 o'clock, within 8 inches of joint: NO - VOID SOIL VISIBLE37.6 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG & CONCRETE37.7 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG63.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - DEEP PEELING CONCRETE72 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - OPEN87.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED121.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - STUB150.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED217.6 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE279.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - OPEN323.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG323.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED323.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE323.8 ft. AMH - Downstream Manhole, Survey Ends - 3:40AM

Observation photos (18)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Missing Wall, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SOIL VISIBLE VOID START

    9.4 ft. - Surface Missing Wall, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SOIL VISIBLE VOID START

  • Surface Missing Wall, from 09 to 03 o'clock, within 8 inches of joint: YES - VOID SOIL SAND & ROCK VISIBLE

    9.4 ft. - Surface Missing Wall, from 09 to 03 o'clock, within 8 inches of joint: YES - VOID SOIL SAND & ROCK VISIBLE

  • Surface Missing Wall, from 08 to 11 o'clock, within 8 inches of joint: YES - DEEP VOID

    11.3 ft. - Surface Missing Wall, from 08 to 11 o'clock, within 8 inches of joint: YES - DEEP VOID

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG & CONCRETE

    12.5 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG & CONCRETE

  • Surface Missing Wall, from 02 to 03 o'clock, within 8 inches of joint: YES - VOID SOIL VISIBLE

    14.7 ft. - Surface Missing Wall, from 02 to 03 o'clock, within 8 inches of joint: YES - VOID SOIL VISIBLE

  • Surface Missing Wall, from 12 to 03 o'clock, within 8 inches of joint: YES, Start - VOID SOIL VISIBLE

    17.3 ft. - Surface Missing Wall, from 12 to 03 o'clock, within 8 inches of joint: YES, Start - VOID SOIL VISIBLE

  • Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL VISIBLE

    17.3 ft. - Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL VISIBLE

  • Surface Missing Wall, from 01 to 04 o'clock, within 8 inches of joint: YES - SOIL VISIBLE

    20.5 ft. - Surface Missing Wall, from 01 to 04 o'clock, within 8 inches of joint: YES - SOIL VISIBLE

  • Surface Missing Wall, from 01 to 03 o'clock, within 8 inches of joint: NO,  - SOIL VISIBLE APPOX 2.5' LONG

    21.7 ft. - Surface Missing Wall, from 01 to 03 o'clock, within 8 inches of joint: NO, - SOIL VISIBLE APPOX 2.5' LONG

  • Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - VOID SOIL VISIBLE

    21.8 ft. - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - VOID SOIL VISIBLE

  • Surface Missing Wall, from 12 to 01 o'clock, within 8 inches of joint: NO - SOIL VISIBLE

    26 ft. - Surface Missing Wall, from 12 to 01 o'clock, within 8 inches of joint: NO - SOIL VISIBLE

  • Surface Missing Wall, from 12 to 02 o'clock, within 8 inches of joint: NO - VOID SOIL VISIBLE

    28.5 ft. - Surface Missing Wall, from 12 to 02 o'clock, within 8 inches of joint: NO - VOID SOIL VISIBLE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    37.7 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - DEEP PEELING CONCRETE

    63.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - DEEP PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    87.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

    150.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED

Observations (35)

DistanceCodeObservation
323.4SAMSEVERE AGG
14.7SMWVOID SOIL VISIBLE
12.5SAMSEVERE AGG & CONCRETE
121.7TFCSTUB
9.4SMWSOIL VISIBLE VOID START
0MGOMH CONN 9:00 ACTIVE
2SSSBLISTERING PEELING CONCRETE
150.4SSSPEELING CONCRETE SEVERE AGG ATTACHED
279.1TFOPEN
217.6TFACTIVE
17.3SMWVOID SOIL VISIBLE
21.8SMWVOID SOIL VISIBLE
72TFOPEN
25SMWVOID SOIL VISIBLE
0MWM
37.6SAMSEVERE AGG & CONCRETE
17.3SMWSOIL VISIBLE
0AMH2:30PM
323.4SSSPEELING CONCRETE SEVERE AGG ATTACHED
63.7SSSDEEP PEELING CONCRETE
323.4SSSBLISTERING PEELING CONCRETE
0MWL
7.9SAMSEVERE AGG
2SAMSEVERE AGG
87.8SSSPEELING CONCRETE SEVERE AGG ATTACHED
21.7SMWSOIL VISIBLE APPOX 2.5' LONG
20.5SMWSOIL VISIBLE
11.3SMWDEEP VOID
37.7SAMSEVERE AGG
12.5SMWVOID SOIL VISIBLE
20.3SMWVOID SOIL VISIBLE
26SMWSOIL VISIBLE
323.8AMH3:40AM
28.5SMWVOID SOIL VISIBLE
9.4SMWVOID SOIL SAND & ROCK VISIBLE

Properties (6)

custom_field_three
VOIDS SOIL VISIBLE ,SOME OVER 3' LONG
custom_field_two
1
customer
LACSD
datetime
2019-12-03T01:58:00-08:00
documentation
MARTIN,REVELES,OLIVER 111,IGNACIO
is_lateral_inspection
false